{"product_id":"industrial-injection-aeps-ae-exchange-injector-8-cyl-only-long-lead","title":"Industrial Injection AEPS - AE EXCHANGE INJECTOR #8 CYL ONLY LONG LEAD","description":"\u003cp\u003e\u003cem\u003eAE EXCHANGE INJECTOR #8 CYL ONLY LONG LEAD\u003c\/em\u003e\u003c\/p\u003e\n\u003cp\u003eIndustrial Injection 7.3L AE Power Stroke Reman Stock Exchange InjectorOur Ford 7.3L re-manufactured injectors are built with all new internal fuel plungers, nozzles\/nozzle springs and OE internal and external O-ring kits. Each oil valve is re-manufactured to OE specs and measures at .004\" armature clearance (We do not shim our oil valves). After the precision assembly process, each injector is calibrated on our state of the art Hartridge HA230 injector calibrator to insure a true 4cc cylinder to cylinder fuel delivery.\u003c\/p\u003e\n\u003ch4\u003eFeatures \u0026amp; Benefits\u003c\/h4\u003e\u003cul\u003e\n\u003cli\u003e1999-2003 Ford F-Series, E-Series (Built after 12\/07\/98)\u003c\/li\u003e\n\u003cli\u003eStock Replacement Injector for 1999-2003 Ford F-Series, E-Series (Built after 12\/07\/98) Diesels.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch4\u003eSpecifications\u003c\/h4\u003e\u003ctable\u003e\u003ctbody\u003e\u003ctr\u003e\n\u003ctd\u003e\u003cstrong\u003eFuel Type\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd\u003eDiesel\u003c\/td\u003e\n\u003c\/tr\u003e\u003c\/tbody\u003e\u003c\/table\u003e","brand":"Industrial Injection","offers":[{"title":"Default Title","offer_id":45446565560364,"sku":"AEPS","price":174.55,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0687\/6007\/6332\/files\/3192_001.jpg?v=1775864225","url":"https:\/\/carpartglobal.com\/products\/industrial-injection-aeps-ae-exchange-injector-8-cyl-only-long-lead","provider":"Car Part Global","version":"1.0","type":"link"}