Out of Stock
Industrial Injection AEPS - AE EXCHANGE INJECTOR #8 CYL ONLY LONG LEAD
Industrial Injection
SKU AEPS

Industrial Injection AEPS - AE EXCHANGE INJECTOR #8 CYL ONLY LONG LEAD

$174.55 USD
Out of Stock
This product is currently out of stock. It will be placed on backorder, and shipping can take 2 or more weeks to fulfill your order. and we will notify you as soon as it is back in stock.
Free shipping To the USA

AE EXCHANGE INJECTOR #8 CYL ONLY LONG LEAD

Industrial Injection 7.3L AE Power Stroke Reman Stock Exchange InjectorOur Ford 7.3L re-manufactured injectors are built with all new internal fuel plungers, nozzles/nozzle springs and OE internal and external O-ring kits. Each oil valve is re-manufactured to OE specs and measures at .004" armature clearance (We do not shim our oil valves). After the precision assembly process, each injector is calibrated on our state of the art Hartridge HA230 injector calibrator to insure a true 4cc cylinder to cylinder fuel delivery.

Features & Benefits

  • 1999-2003 Ford F-Series, E-Series (Built after 12/07/98)
  • Stock Replacement Injector for 1999-2003 Ford F-Series, E-Series (Built after 12/07/98) Diesels.

Specifications

Fuel Type Diesel
A vehicle fitment list isn’t available for this part.

Please check the product description for the manufacturer’s application details, or ask a specialist — we’ll confirm whether it fits your vehicle before you buy.

Shipping Information

Free shipping is available for eligible orders.

Shipping: Free to the USA.

Orders are processed during normal business days. Delivery dates may vary by carrier and destination.

Owner Reviews

Be the first to review this part. Real owner feedback, tagged with the exact vehicle it was fitted to, helps the next shopper buy with confidence.

Questions & Answers

Our techs answer fitment questions, usually within 2 hours. Owners chime in too.

0 questions

No questions yet. Here's what shoppers usually ask. Tap one and our techs will answer.

Ask a Question

Write a review

Share your experience with this part. Reviews are checked before they go live.

Fit
Guaranteed
Fast
Shipping
Easy
Returns
Real
Support
$174.55